Image is for reference only.
YAGEO
Manufacturer Part #:
PA2512FKE7T0R004E
Manufacturer:
Package:
2512
Description:
RES 0.004 OHM 1% 3W 2512
For any specific requests regarding price, qty, ect. please send an RFQ.
Mfr | YAGEO |
Series | PA_E |
Package | Tape & Reel (TR) |
Ratings | AEC-Q200 |
Features | Automotive AEC-Q200, Current Sense, Moisture Resistant |
Tolerance | ±1% |
Resistance | 4 mOhms |
Composition | Metal Element |
Power (Watts) | 3W |
Package / Case | 2512 (6432 Metric) |
Product Status | Active |
Size / Dimension | 0.250" L x 0.125" W (6.35mm x 3.18mm) |
Height - Seated (Max) | 0.035" (0.88mm) |
Operating Temperature | -55°C ~ 170°C |
Number of Terminations | 2 |
Supplier Device Package | 2512 |
Temperature Coefficient | ±50ppm/°C |
For your convenience, we support multiple payment methods, including PayPal, credit cards, and bank transfers, all payments are settled in USD.
1. For products with available stock and price, you can directly place an order.
2. For products without stock or price displayed, please submit an RFQ, and we will respond within 24 hours.
SemiKey Stock: Inventory purchased directly from original manufacturers, authorized distributors, or OEM/EMS.
Authorized Distributor: Channels from the original manufacturer or their authorized distributors.
OEM & EMS: Excess inventory from OEM and EMS providers.
If you choose to use our shipping account, the shipping cost must be paid when placing the order. If you choose to use your own shipping account, the cost will depend on the agreement between you and the shipping company.
Please note: Customers are responsible for all fees charged by the destination government or customs, including but not limited to duties, taxes, and any additional fees charged by the courier company. SemiKey is not responsible for any extra charges once the package has been shipped.
We currently offer shipping through DHL, FedEx, SF Express, and UPS.
For SemiKey-owned stock, orders are estimated to ship within 3 days.
Data from other suppliers may not be updated in time, and lead times need to be re-confirmed.
After shipment, the estimated delivery time will depend on the logistics service you choose.
connectors
2024-03-26 360
Basic knowledge of crystal vibration, circuit design, non-vibration reasons, circuit principle, crystal frequency, digital circuit application (crystal vibration data download)
2024-02-26 382
Order transfer! A 30-year old Hong Kong-owned PCB factory in Shenzhen was sold
2024-01-25 292
Renesas Acquires Transphorm for $339 Million to Accelerate Gallium Nitride Market Expansion
2024-01-25 305