Image is for reference only.
TDK Corporation
Manufacturer Part #:
CKCL22X7R1A224M085AL
Manufacturer:
Package:
0805 (2012 Metric)
Description:
CAP ARRAY 0.22UF 10V X7R 0805
For any specific requests regarding price, qty, ect. please send an RFQ.
Mfr | TDK Corporation |
Series | CKC |
Package | Tape & Reel (TR) |
Ratings | AEC-Q200 |
Tolerance | ±20% |
Capacitance | 0.22µF |
Circuit Type | Isolated |
Mounting Type | Surface Mount |
Package / Case | 0805 (2012 Metric) |
Product Status | Obsolete |
Voltage - Rated | 10 V |
Size / Dimension | 0.079" L x 0.049" W (2.00mm x 1.25mm) |
Dielectric Material | Ceramic |
Number of Capacitors | 2 |
Height - Seated (Max) | 0.033" (0.85mm) |
Supplier Device Package | 0805 (2012 Metric) |
Temperature Coefficient | X7R |
For your convenience, we support multiple payment methods, including PayPal, credit cards, and bank transfers, all payments are settled in USD.
1. For products with available stock and price, you can directly place an order.
2. For products without stock or price displayed, please submit an RFQ, and we will respond within 24 hours.
SemiKey Stock: Inventory purchased directly from original manufacturers, authorized distributors, or OEM/EMS.
Authorized Distributor: Channels from the original manufacturer or their authorized distributors.
OEM & EMS: Excess inventory from OEM and EMS providers.
If you choose to use our shipping account, the shipping cost must be paid when placing the order. If you choose to use your own shipping account, the cost will depend on the agreement between you and the shipping company.
Please note: Customers are responsible for all fees charged by the destination government or customs, including but not limited to duties, taxes, and any additional fees charged by the courier company. SemiKey is not responsible for any extra charges once the package has been shipped.
We currently offer shipping through DHL, FedEx, SF Express, and UPS.
For SemiKey-owned stock, orders are estimated to ship within 3 days.
Data from other suppliers may not be updated in time, and lead times need to be re-confirmed.
After shipment, the estimated delivery time will depend on the logistics service you choose.
connectors
2024-03-26 357
Basic knowledge of crystal vibration, circuit design, non-vibration reasons, circuit principle, crystal frequency, digital circuit application (crystal vibration data download)
2024-02-26 380
Order transfer! A 30-year old Hong Kong-owned PCB factory in Shenzhen was sold
2024-01-25 289
Renesas Acquires Transphorm for $339 Million to Accelerate Gallium Nitride Market Expansion
2024-01-25 297